Well, the basement bathroom has yet to be finished. The cultured marble surround and vanity top have been done for over a week now. And yet we still wait for installation.
The first install date was cancelled because of snow. Yes, I said snow, April 18th and snow. The installer said the dust is worse than sheetrock dust. They make all their cuts outside. Sounds good to me. So they can't cut in the rain, go figure, where is a little sense of adventure, what is a little shock or two.
So they rescheduled for today, the 19th, and well the joys of living in a growing area. They have a 5 hour scheduled outage of power. Guess all the digging has finally resulted in a new connection for something.
Since the install takes 5 hours and the installer has somewhere else to be at five today, re are rescheduled again.
Maybe Saturday will be the magic day. Good thing I really don't need the bathroom.
Drafted by: Brian